The roundabout at the intersection of Rothsville Road / Clay Road (Warwick Township) is now open. The Sixth Street extension will remain closed until the road is constructed, but the remaining access roads will be open.
For anyone not familiar with how to navigate through a roundabout, PennDOT published a 2-page pamphlet which is attached. This explains the construction and rules of the road so you can safely travel through.
During the previous period of construction, the posted detour route included several roadways in Lititz Borough which resulted in an increased volume of traffic. Residents along the detour route should see a decrease in traffic volume now.
Media contact: Media@LititzPD.org