PA American Water will be doing door-to-door surveys with residents to ascertain if they have lead or non-lead service lines to their property. The survey representatives will have the below identification from CD Smith, who is contracted to do the survey.
They will also be providing door-hanger literature upon their contact.
Permits are not required for this survey under the Township Ordinance.
The survey will begin at the end of April.